Latest News

Author: Red7Marine

RED7MARINE SUPPORTS IMPLENIA WITH THE CONSTRUCTION OF NEW €258M BRIDGE OVER THE KIEL CANAL

Red7Marine has been recently involved in supporting the construction of a new €258M bridge over the Kiel Canal in Rendsburg, Germany. 10 years ago, severe damage was found on the Rader High Bridge, which originally opened in 1972. Traffic has increased extensively over the last few years, and it is expected 63,000 vehicles will be … Continue reading "RED7MARINE SUPPORTS IMPLENIA WITH THE CONSTRUCTION OF NEW €258M BRIDGE OVER THE KIEL CANAL"

 

Red7Marine Completes Piling for Lowestoft Eastern Energy Facility

Great to be supporting McLaughlin & Harvey Ltd for the infrastructure upgrades taking place to the Outer Harbour at Associated British Ports’s Port of Lowestoft. The Red7Marine team completed a proof dig of the site before Christmas, using our Haven SeaStabler equipped with a 38t long reach, ahead of the piling operations commencing. The SeaStabler … Continue reading "Red7Marine Completes Piling for Lowestoft Eastern Energy Facility"

 

BESPOKE PILE GATE FABRICATION – PORT OF SHEERNESS

  Red7Marine recently supported GPS Marine and Civil Services Ltd with the design of a pile gate being used on the company’s current project at the Port of Sheerness. Our in-house engineering team made modifications to our existing pile gate, which was originally used on Red7Marine’s Galloper project. The two-tiered gate was used to assist pile … Continue reading "BESPOKE PILE GATE FABRICATION – PORT OF SHEERNESS"

 

MEET THE TEAM – CONNOR MURPHY

  Connor Murphy is in his second year of a four year Mechatronics engineering apprenticeship with Red7Marine. Connor achieved a Level 3 Diploma in Engineering from Colchester Institute in 2022 and is currently studying towards a Level 3 Extended Diploma whilst continuing his apprenticeship. Connor joined Red7Marine following his interest in the marine industry, specifically … Continue reading "MEET THE TEAM – CONNOR MURPHY"

 

Meet the Team – Ryan Deakin-Hough, Lead Engineer

Ryan joined Red7Marine after graduating from the University of Central Lancashire in 2020, with first-class honours in Engineering. “After joining Red7Marine I instantly recognised the great mix of hard work and entertainment in the office and onsite – with the office based within our fabrication yard at Cliff Quay, we always remain close to the … Continue reading "Meet the Team – Ryan Deakin-Hough, Lead Engineer"

 
Get in touch with our expert team

or speak to our team: 01255 886710

British Standards ISO British Standards ISO British Standards ISO Achilles Building Confidence IEMA Construction Line Chas Ijuboa CPA National Workboat Association ICE Mates in Mind AF Covenenant Gold award