Sofia Offshore Site Investigation

Redcar

Project Type: Offshore Wind

Return to Projects

Case Study Overview

Red7Marine’s 250t Haven Seariser 2 jack-up barge supported Fugro’s offshore site investigation in the nearshore area between Redcar and Marske-by the-Sea for innogy’s Sofia Offshore Wind Farm.

At a glance

  • Location: Redcar
  • Plant used: 250T Haven Seariser 2
  • What we did: Red7Marine supported Fugro’s pre-construction site investigation at innogy’s Sofia Offshore wind project
–

The Challenge

Borehole data along with earlier surveys were required for pre-construction site investigation to inform final design planning and methodology for the export cable and its installation at Sofia Offshore Wind Farm.

Sofia Windfarm
–

The Solution

Red7Marine’s Haven Seariser 2 was positioned on-site in Redcar to complete the first borehole. The versatile jack-up barge has four legs that were lowered to the seabed using detailed stability calculations carried out by Red7Marine’s in-house engineering team. By lowering the legs, the barge is able to lift up above the water creating a steady platform for each borehole to be safely carried out. The barge was then towed between borehole sites by a towing vessel to complete the site investigation.

Sofia Windfarm
–

Complete Package Delivery

Red7Marine provided equipment, crew and engineering support to the project to ensure our clients’ successful delivery.

Solutions Provider

Red7Marine provided specialist barge and marine experience to the project.

Skilled Team

Red7Marine’s operations and engineering teams are highly skilled and experienced in the marine environment providing partners with an industry-leading service.

–