Wapping Police Pontoon 2020

Case Study Overview

Under Coniston’s framework agreement with the Metropolitan Police, Red7Marine was contracted to undertake extensive repair works at Wapping Boat Yard.

These works included:

  • The installation of two mooring piles to the police mooring pontoon
  • Structural Repairs to the boatlift platform following impact from a river cruise boat
  • The installation of new timber fendering and refurbishment of boatlift

At a glance

  • Location: Metropolitan Police Marine Unit, Wapping, London
  • Plant used: Haven Seaseven 400T jack-up barge / Haven Seaforth flat top barge
  • What we did: Red7Marine carried out essential repairs to the Wapping Police Pontoon.
  • Contract value: £1,800,000

The Challenge

In January 2020 a London Party boat collided with the Metropolitan Police Marine Policing Unit dock, damaging the pontoon and the Syncrolift which is used to lift vessels in and out of the water for maintenance.

The pontoon is used 24/7 to respond to terror threats and other maritime emergencies along 56 miles of the Thames – making the repair works critical.

Red7Marine has been responsible for delivering the important remedial works which have been carried out under two named storms: Storm Ciara and Storm Dennis and throughout the COVID-19 pandemic. The programme has been carried out safely and in line with advice from the government and WHO along with our own safety measures and risk assessments.

Wapping Challenge

The Solution

The pontoon suffered damage to the concrete pillars of its hoist and the collision meant the lift was no longer safe to use. The Syncrolift was damaged so badly that its ability to provide the best policing had been significantly reduced and the unit could no longer lift boats in and out of the river from the yard to the water and vice versa.

Red7Marine was contracted to provide specialist marine expertise and support to the project which has involved:

Boat Lift Repairs

  • Removing the existing platform to fit in with operational requirements and disposing of concrete posts and timbers
  • Soffit access and shutters installed along with 2 new 970mm x 28.6mm thk x 20m piles and deck reinforcement
  • Overseeing diving works to remove subsea frames from piles and to remove lower timber fenders
  • Repaired and recommissioned winches and reinstated boat lift deck and frame which has been successfully load tested

Pontoon

  • Installing new dolphins 2no 1.2m diameter piles x 25m long which were trimmed to level. Piles were installed using a vibration hammer.
  • Connecting new dolphins to the existing pontoon
  • Our in-house engineering department completed pre-planning, construction sequencing and logistical assessments for all project operations within the challenging marine environment. The team then further analysed and designed all project temporary works including piling gates, access / egress gangways, marine heavy lift plans and stability / structural checks for all jack-up barge operations.
  • All marine operations were thoroughly planned to mitigate risk, planning around tides and weather windows.

Wapping Solution

Wapping Solution

Complete Package Delivery

Red7Marine provided equipment, crew and engineering support to the project to ensure our clients’ successful delivery.

Solutions Provider

Red7Marine provided specialist barge and marine experience to the project.

Skilled Team

Red7Marine’s operations and engineering teams are all highly skilled and experienced in the marine environment providing partners with an industry-leading service.

THE MARINE PARTNER OF CHOICE

SEE RELATED CASE STUDIES

Westminster

Westminster Pier Extension

The Westminster Pier Extension allows more frequent River Bus services between Woolwich and North Greenwich to Westminster. The extension is a key part of the River Action Plan to improve TfL’s piers and increase capacity for passengers before 2020. Red7Marine designed and built a custom pile gate for the project. The barge was reviewed to support a 180t crawler crane for piling operations and was then further reviewed with an additional RH28 drill rig on board.

Read more →

Brighton

Brighton Marina
Phase 2

In order to accommodate a new luxury apartment block in Brighton, part of the marina needed to be reclaimed using sheet piled cofferdams. This would enable the water to be kept out and foundations to be built for the stunning seafront properties. Red7Marine supported the installation of a sheet pile twin wall cofferdam.

Read more →

Oldbury

Oldbury

Red7Marine installed replacement Active Effluent Discharge Lines at Oldbury power station as part of the on-going care and maintenance works. Red7Marine’s previous project experience on similar projects consisting of works on subsea pipeline and outfalls at Bradwell and Sizewell nuclear power stations, positioned the company as the ideal marine partner for client, Magnox.

Read more →

Emirates

Emirates Cable Car

The Emirates cable car was installed to provide a pedestrian link across the River Thames between the Royal Docks and the Greenwich peninsula. Red7Marine worked with Bachy Soletanche in a joint venture to install the foundations for the one-kilometre long cable car using marine rotary bored piling.

Read more →

Middleton

Middleton Sands Navigation Marker

This fast turn-around marine construction project involved the installation of a new tubular steel navigation marker pile at Middleton Sands, Barrow-in-Furness in 2017. The navigation marker was required to identify the sub surface obstructions and enable other vessels in the area to operate safely.

Read more →

Liverpool 2

Liverpool 2 Deep Water Port Extension

Red7Marine was the marine partner of choice for BAM Nuttall when they constructed a piled combi-wall as part of the Liverpool 2 Dock Expansion that began in 2014. The construction of the container terminal was supported by four of Red7Marine’s jack up barges; the Haven Seariser 1, Haven Seariser 2 and the Haven Seariser 3 and the Haven Seajack as it carried out rock socket piling works.

Read more →

Weston Super Mare

Weston-Super-Mare

The Red7Marine team was chosen to provide specialist marine plant and personnel to aid the redevelopment of the Weston-super-Mare Grand Pier after it was destroyed in a fire in 2008. Red7Marine supplied the Haven Seajack 4 assisted in the pier construction works. Its previous experience in pier and marina construction works made it the ideal project partner for this development.

Read more →

Bradwell

Bradwell Power Station Barrier Wall Removal

Red7Marine is a leading provider of equipment for marine demolition and is skilled in dismantling structures that are beyond the reach of ordinary demolition contractors. In 2012, Red7Marine removed approximately 800 tonnes of steel in the Blackwater Estuary from the Bradwell nuclear power station water intake structure.

Read more →

Fingringhoe

Fingringhoe Firing Ranges

Red7Marine installed scour protection and provided remediation on damaged sections of the flood defences to preserve areas of the salt marsh at the Fingringhoe firing ranges in Essex. Scour protection and remediation techniques are used to control erosion in both estuarine and the offshore environments.

Read more →

Get in touch with our expert team

or speak to our team: 01255 886710

British Standards ISO British Standards ISO British Standards ISO Achilles Building Confidence IEMA Construction Line Chas Ijuboa CPA National Workboat Association ICE Mates in Mind AF Covenenant Gold award

“It is always a pleasure working with such a highly motivated and professional team, from office to site team working alongside us we could not ask for any better working partnership between our companies. Once again, many thanks and look forward to our next project.”

Lawrence Rogers, Works Manager Mackley