Our Marine Wind Farm Services
Operations and Maintenance (O&M)
Downtime is costly, so our team are on standby to ensure swift, expert intervention when structural or component maintenance and replacement is needed. Red7Marine offers a range of services including vessels, crew, equipment, planning and engineering services, to deliver a truly turnkey O&M solution.
- Component Repairs
Expert teams support the repair and replacement of any structural or operational part of a wind farm to minimise downtime and maximise efficiency. - Cost-Effective Fleet
Smaller, more versatile vessels provide a competitive alternative to traditional O&M solutions. - Specialist Support
Our in-house team of engineers can help with: site-specific assessments, leg penetration analysis, seafastening design, project management, lift planning and supervision. We also regularly work with marine warranty surveyors who review all relevant documentation and approve our vessels for the task at hand.
Site Investigation
A full understanding of the conditions on site is vital to the success of any project at sea.
Examples of site investigation campaigns we’ve supported with our vessels and accompanying personnel at UK wind farms include:
- Scroby Sands Offshore Wind Farm
- Sofia Offshore Wind Farm
- Norfolk Vanguard and Boreas Offshore Wind Farm
Decommissioning
Red7Marine offers turnkey packages for decommissioning operations whether it’s met masts, blades or foundations.
Managing everything from engineering feasibility and equipment planning to the safe removal of infrastructure, our proven track record and focus on safety ensures clients can trust us to handle this critical final phase with care.
Cable Installation,
Maintenance and Repair
Red7Marine supports subsea cable projects for offshore wind farms. From landfalls for interconnectors, export cables and HDD operations, or cable maintenance and repair.
We provide specialist engineering support and operational assistance for these challenging intertidal projects.
01 Logistical Coordination
Jack-up barge and support vessel mobilisation to ensure everything is where it needs to be when it needs to be there.
02 Custom Fabrication
We design and build bespoke tools and cable ducts to ensure the smooth handling and operation of heavy, delicate cables.
03 Emergency Repairs
Rapid mobilisation to address cable failures to quickly restore functionality.
For more information see our dedicated Cables page >
Artificial Nesting Structures
Red7Marine installed the UK’s first artificial nesting structure as a part of the Hornsea 3 Offshore Wind Farm development.
Comprising piled foundations and topside structures, these are increasingly becoming a requirement of Development Consent Orders for new offshore wind farms.
Red7Marine has the unique experience and specialist technical knowledge to deliver these projects under the full role of Principal Contractor managing the design, supply, installation, EPC and EPCI.
Why Choose red 7 marine?

Complete Life
Cycle Expertise

Health & Safety
Leadership

In-House
Expertise

Fleet
Versatility

Rapid
Mobilisation

Sustainability
Commitment
Case Study:
Hornsea 3 HDD Duct Installation
With extensive engineering input and operating from our 1,000t Haven SeaChallenger jack-up barge, Red7Marine supported directional drilling specialist AMS No-Dig and end client Ørsted on the installation of three HDD ducts, which will act as the protective sleeve for the offshore power cable for Hornsea 3 Offshore Wind Farm.