Eccles to Winterton

Case Study Overview

Red7Marine supported Principal Contractor, Mackley / Van Oord in carrying out maintenance and refurbishment of Aids to Navigation located on the coastal frontage between Eccles and Winterton, Norfolk.

The 26 Aids to Navigation are managed and maintained by the Environment Agency.

At a glance

  • Location: Eccles to Winterton, Norfolk
  • Plant used: Haven Seajack 3 100t jack-up barge
  • What we did: Red7Marine supported Mackley / Van Oord for the maintenance and refurbishment of Aids to Navigation between Eccles and Winterton.

The Challenge

The tender was awarded to Mackley / Van Oord under the Environment Agency’s
Marine and Coastal Framework. The original tender was published in 2020 and the team spent over a year working on numerous value engineering options and several scope iterations.

The project began in August 2021 and was completed in October 2021.

Eccles

The Solution

The project consisted of the following aspects:

  • Refurbishment of 7No. offshore reef markers
  • Refurbishment of 2No. offshore reef markers (cardinal markers)
  • Removal and replacement of 2No. flashing beacons on terminal reef markers

Red7Marine supported the Mackley / Van Oord team by mobilising the Haven Seajack 3 jack-up barge, providing an overwater working platform for the refurbishment works to take place.

Lawrence Rogers, Works Manager at Mackley comments:
“Right from the start Red7Marine were with us all the way. Everything that was asked was done, and there were many changes along the way as you can imagine. All the team were very helpful, and efficient, contactable seven days a week, and all the planning
around the mobilisation enables us to get on site at exactly the right date. All off the Barge Master’s on-site know there stuff, and were willing to help out on board, and to push the job along. We had to work some very long days here due to weather restrictions, but never a moan. It has again been a pleasure working with your team, and will personally look forward to working with Red7Marine again on the next mission.”

Project Manager, Andy Bosman comments:
“It is always a pleasure working with such a highly motivated and professional team, from office to site team working alongside us we could not ask for any better working partnership between our companies. Once again many thanks and look forward to our next project.”

Eccles
THE MARINE PARTNER OF CHOICE

SEE RELATED CASE STUDIES

Westminster

Westminster Pier Extension

The Westminster Pier Extension allows more frequent River Bus services between Woolwich and North Greenwich to Westminster. The extension is a key part of the River Action Plan to improve TfL’s piers and increase capacity for passengers before 2020. Red7Marine designed and built a custom pile gate for the project. The barge was reviewed to support a 180t crawler crane for piling operations and was then further reviewed with an additional RH28 drill rig on board.

Read more →

Brighton

Brighton Marina
Phase 2

In order to accommodate a new luxury apartment block in Brighton, part of the marina needed to be reclaimed using sheet piled cofferdams. This would enable the water to be kept out and foundations to be built for the stunning seafront properties. Red7Marine supported the installation of a sheet pile twin wall cofferdam.

Read more →

Oldbury

Oldbury

Red7Marine installed replacement Active Effluent Discharge Lines at Oldbury power station as part of the on-going care and maintenance works. Red7Marine’s previous project experience on similar projects consisting of works on subsea pipeline and outfalls at Bradwell and Sizewell nuclear power stations, positioned the company as the ideal marine partner for client, Magnox.

Read more →

Emirates

Emirates Cable Car

The Emirates cable car was installed to provide a pedestrian link across the River Thames between the Royal Docks and the Greenwich peninsula. Red7Marine worked with Bachy Soletanche in a joint venture to install the foundations for the one-kilometre long cable car using marine rotary bored piling.

Read more →

Middleton

Middleton Sands Navigation Marker

This fast turn-around marine construction project involved the installation of a new tubular steel navigation marker pile at Middleton Sands, Barrow-in-Furness in 2017. The navigation marker was required to identify the sub surface obstructions and enable other vessels in the area to operate safely.

Read more →

Liverpool 2

Liverpool 2 Deep Water Port Extension

Red7Marine was the marine partner of choice for BAM Nuttall when they constructed a piled combi-wall as part of the Liverpool 2 Dock Expansion that began in 2014. The construction of the container terminal was supported by four of Red7Marine’s jack up barges; the Haven Seariser 1, Haven Seariser 2 and the Haven Seariser 3 and the Haven Seajack as it carried out rock socket piling works.

Read more →

Weston Super Mare

Weston-Super-Mare

The Red7Marine team was chosen to provide specialist marine plant and personnel to aid the redevelopment of the Weston-super-Mare Grand Pier after it was destroyed in a fire in 2008. Red7Marine supplied the Haven Seajack 4 assisted in the pier construction works. Its previous experience in pier and marina construction works made it the ideal project partner for this development.

Read more →

Bradwell

Bradwell Power Station Barrier Wall Removal

Red7Marine is a leading provider of equipment for marine demolition and is skilled in dismantling structures that are beyond the reach of ordinary demolition contractors. In 2012, Red7Marine removed approximately 800 tonnes of steel in the Blackwater Estuary from the Bradwell nuclear power station water intake structure.

Read more →

Fingringhoe

Fingringhoe Firing Ranges

Red7Marine installed scour protection and provided remediation on damaged sections of the flood defences to preserve areas of the salt marsh at the Fingringhoe firing ranges in Essex. Scour protection and remediation techniques are used to control erosion in both estuarine and the offshore environments.

Read more →

Get in touch with our expert team

or speak to our team: 01255 886710

British Standards ISO British Standards ISO British Standards ISO Achilles Building Confidence IEMA Construction Line Chas Ijuboa CPA National Workboat Association ICE Mates in Mind AF Covenenant Gold award

“Great Yarmouth Third River Crossing: The Red7Marine team have played a big part in the success of the cofferdam piling works. Once again, the spirit of cooperation between all involved has been exemplary and this goes a long way towards making life easier for all involved. I would like to pass on my personal thanks to everyone at Red7Marine for your help and I look forward to working with you all again at some point in the future.”

Richard Hayman, Construction Manager BAM Nuttall