(TEMPORARY WORKS SUPPORT)
Case Study Overview
Jan De Nul Group contracted Red7Marine to supply its 400t Haven SeaSeven Jack-Up vessel for the export cable installation at Hollandse Kust offshore windfarm.
As a part of the project, Red7Marine was responsible for the design and fabrication of a cable highway platform for the vessel to support 8T/m2 loadings and 20T of lateral forces for cable tensioning operations.
At a glance
- Location: Hollandse Kust Offshore Windfarm, Netherlands
- Plant used: 400T Haven SeaSeven
- What we did: Red7Marine designed and fabricated a bespoke cantilever platform for Jan De Nul to support cable tensioning operations at Hollandse Kust Offshore windfarm.

DESIGN & FABRICATION
The cable highway platform concepts were developed over a five-month period. Conceptual drawings were produced with the final dimensions of the cantilever platform agreed at 2.5m x 31.5m (length of the vessel).
Red7Marine’s coded welders fabricated the platform within the company’s quayside fabrication and maintenance workshop on the banks of River Orwell in Ipswich.

MOBILISATION
The SeaSeven was mobilised in Tilbury where the cantilever cable highway system was installed on the barge before its departure to the Netherlands. The mobilisation included:
- Relocating refurbished bollards and fairleads
- Installing 6 x platform cantilever brackets and 3 x platform top
sections - Installing handrails to the perimeter of the platform
- Installation of the CTV ladder

DEPLOYMENT
Following its arrival in the Port of Ijmuiden, the barge was situated on-site in the nearshore intertidal area. The platform cantilevered 2.4m over the portside of the barge and was used during the export cable installation to act as a tensioner station to reduce the total export cable tension.

SEE RELATED CASE STUDIES
Brighton Marina
Phase 2
In order to accommodate a new luxury apartment block in Brighton, part of the marina needed to be reclaimed using sheet piled cofferdams. This would enable the water to be kept out and foundations to be built for the stunning seafront properties. Red7Marine supported the installation of a sheet pile twin wall cofferdam.
Oldbury
Red7Marine installed replacement Active Effluent Discharge Lines at Oldbury power station as part of the on-going care and maintenance works. Red7Marine’s previous project experience on similar projects consisting of works on subsea pipeline and outfalls at Bradwell and Sizewell nuclear power stations, positioned the company as the ideal marine partner for client, Magnox.
Emirates Cable Car
The Emirates cable car was installed to provide a pedestrian link across the River Thames between the Royal Docks and the Greenwich peninsula. Red7Marine worked with Bachy Soletanche in a joint venture to install the foundations for the one-kilometre long cable car using marine rotary bored piling.
Battersea River Pier
Red7Marine secured a contract at Battersea in December 2016 to install new tubular driven steel mooring piles for the Battersea Power Station river bus pontoon installation which is planned to be operational in Autumn 2017. Transport for London (TFL) decided to extend the river bus service after the number of housing developments at Battersea began to increase.
Middleton Sands Navigation Marker
This fast turn-around marine construction project involved the installation of a new tubular steel navigation marker pile at Middleton Sands, Barrow-in-Furness in 2017. The navigation marker was required to identify the sub surface obstructions and enable other vessels in the area to operate safely.
Liverpool 2 Deep Water Port Extension
Red7Marine was the marine partner of choice for BAM Nuttall when they constructed a piled combi-wall as part of the Liverpool 2 Dock Expansion that began in 2014. The construction of the container terminal was supported by four of Red7Marine’s jack up barges; the Haven Seariser 1, Haven Seariser 2 and the Haven Seariser 3 and the Haven Seajack as it carried out rock socket piling works.
Weston-Super-Mare
The Red7Marine team was chosen to provide specialist marine plant and personnel to aid the redevelopment of the Weston-super-Mare Grand Pier after it was destroyed in a fire in 2008. Red7Marine supplied the Haven Seajack 4 assisted in the pier construction works. Its previous experience in pier and marina construction works made it the ideal project partner for this development.
Bradwell Power Station Barrier Wall Removal
Red7Marine is a leading provider of equipment for marine demolition and is skilled in dismantling structures that are beyond the reach of ordinary demolition contractors. In 2012, Red7Marine removed approximately 800 tonnes of steel in the Blackwater Estuary from the Bradwell nuclear power station water intake structure.
Fingringhoe Firing Ranges
Red7Marine installed scour protection and provided remediation on damaged sections of the flood defences to preserve areas of the salt marsh at the Fingringhoe firing ranges in Essex. Scour protection and remediation techniques are used to control erosion in both estuarine and the offshore environments.