Twelve Quays

Case Study Overview

Red7Marine supported principal contractor Farrans Construction at the Twelve Quays Jetty Construction. Our in-house engineering department conceptualised, designed and implemented all temporary work solutions, planned and managed project risks, whilst our Marine Operatives oversaw the installation of four raking piles as part of an ongoing contract.

At a glance

  • Location: Birkenhead
  • Plant used: Haven Seariser 1 and Haven Seaseven Jack-Up Barges
  • What we did: Visited our client’s project site and studied project documentation. Assisted the client with the planning and delivery of all temporary work solutions which included: an access and egress solution, single & double-layered piling gate, jack-up stability assessments and a site geotechnical review. We planned all marine operations to suit Red7Marine’s bespoke marine vessels. Our Marine Operatives also managed the vessels and assisted Farrans with the complex installation of four raking piles and new berthing piles from our 250t & 400t Jack-Up Barges. These modular barges played an integral role in providing stable working platforms for the ongoing contract.

The Challenge

Our team faced unpredictable marine conditions throughout this project including a 10m tidal range, strong winds and large swell. As part of the works, we supported the installation of 14 vertical piles and four raking piles which proved to be particularly challenging, because of the surrounding existing structures, UXO risk, unprecedented geotechnical and environmental conditions.

  • Due to the large tidal range, currents reached > 5m/s, and unsheltered waters resulted in regular wave heights > 3m.
  • Geotechnical conditions presented multi-layered soils with high risk of punch through and scour across the marine site.
  • Dual angled raking piles designed next to the existing jetty resulted in constructability issues and limited space to conduct piling works.

Speaking of these challenges, Jacob Ben-Arie, Maritime Engineer, says: ‘The Twelve Quays project was located on the River Mersey and provided difficult environmental conditions for all Marine Construction activities. It is Red7Marine’s technical capabilities and experience that enables such challenging projects to be delivered successfully for our clients’.

Twelve Quays Challenge

The Solution

Red7Marine engineers and marine operatives provided the client with solutions throughout the project’s life cycle. Assisting with the planning of marine operations, designing temporary works solutions, and assisting with fabrication and implementing solutions on site.

All site movements were planned to reduce risk and ensure safe operations were conducted, planning around slack waters and weather windows, reviewing detailed forecasts day-to-day.

Detailed JUB stability and leg penetration assessments were carried out across the site, enabling risks to be mitigated and associated procedures implemented.

Large scale temporary works for the project were designed, with some elements fabricated (in-house), and assisted Farrans with the complex raking and vertical pile installation requirements. Over 250T of steel was managed across Red7Marine’s barge over the project lifecycle.

The flexibility of our Haven Seaseven and Haven Seariser 1 allowed us to deliver the works despite these challenges, whilst our team’s determination meant that the project was completed in a timely manner.

Twelve Quays Solution

Complete Package Delivery

Red7Marine provided equipment, crew and engineering support to the project to ensure our clients’ successful delivery.

Solutions Provider

Red7Marine provided specialist barge and marine experience to the project.

Skilled Team

Red7Marine’s operations and engineering teams are all highly skilled and experienced in the marine environment providing partners with an industry-leading service.

THE MARINE PARTNER OF CHOICE

SEE RELATED CASE STUDIES

Westminster

Westminster Pier Extension

The Westminster Pier Extension allows more frequent River Bus services between Woolwich and North Greenwich to Westminster. The extension is a key part of the River Action Plan to improve TfL’s piers and increase capacity for passengers before 2020. Red7Marine designed and built a custom pile gate for the project. The barge was reviewed to support a 180t crawler crane for piling operations and was then further reviewed with an additional RH28 drill rig on board.

Read more →

Brighton

Brighton Marina
Phase 2

In order to accommodate a new luxury apartment block in Brighton, part of the marina needed to be reclaimed using sheet piled cofferdams. This would enable the water to be kept out and foundations to be built for the stunning seafront properties. Red7Marine supported the installation of a sheet pile twin wall cofferdam.

Read more →

Oldbury

Oldbury

Red7Marine installed replacement Active Effluent Discharge Lines at Oldbury power station as part of the on-going care and maintenance works. Red7Marine’s previous project experience on similar projects consisting of works on subsea pipeline and outfalls at Bradwell and Sizewell nuclear power stations, positioned the company as the ideal marine partner for client, Magnox.

Read more →

Emirates

Emirates Cable Car

The Emirates cable car was installed to provide a pedestrian link across the River Thames between the Royal Docks and the Greenwich peninsula. Red7Marine worked with Bachy Soletanche in a joint venture to install the foundations for the one-kilometre long cable car using marine rotary bored piling.

Read more →

Middleton

Middleton Sands Navigation Marker

This fast turn-around marine construction project involved the installation of a new tubular steel navigation marker pile at Middleton Sands, Barrow-in-Furness in 2017. The navigation marker was required to identify the sub surface obstructions and enable other vessels in the area to operate safely.

Read more →

Liverpool 2

Liverpool 2 Deep Water Port Extension

Red7Marine was the marine partner of choice for BAM Nuttall when they constructed a piled combi-wall as part of the Liverpool 2 Dock Expansion that began in 2014. The construction of the container terminal was supported by four of Red7Marine’s jack up barges; the Haven Seariser 1, Haven Seariser 2 and the Haven Seariser 3 and the Haven Seajack as it carried out rock socket piling works.

Read more →

Weston Super Mare

Weston-Super-Mare

The Red7Marine team was chosen to provide specialist marine plant and personnel to aid the redevelopment of the Weston-super-Mare Grand Pier after it was destroyed in a fire in 2008. Red7Marine supplied the Haven Seajack 4 assisted in the pier construction works. Its previous experience in pier and marina construction works made it the ideal project partner for this development.

Read more →

Bradwell

Bradwell Power Station Barrier Wall Removal

Red7Marine is a leading provider of equipment for marine demolition and is skilled in dismantling structures that are beyond the reach of ordinary demolition contractors. In 2012, Red7Marine removed approximately 800 tonnes of steel in the Blackwater Estuary from the Bradwell nuclear power station water intake structure.

Read more →

Fingringhoe

Fingringhoe Firing Ranges

Red7Marine installed scour protection and provided remediation on damaged sections of the flood defences to preserve areas of the salt marsh at the Fingringhoe firing ranges in Essex. Scour protection and remediation techniques are used to control erosion in both estuarine and the offshore environments.

Read more →

Get in touch with our expert team

or speak to our team: 01255 886710

British Standards ISO British Standards ISO British Standards ISO Achilles Building Confidence IEMA Construction Line Chas Ijuboa CPA National Workboat Association ICE Mates in Mind AF Covenenant Gold award

“Great Yarmouth Third River Crossing: The Red7Marine team have played a big part in the success of the cofferdam piling works. Once again, the spirit of cooperation between all involved has been exemplary and this goes a long way towards making life easier for all involved. I would like to pass on my personal thanks to everyone at Red7Marine for your help and I look forward to working with you all again at some point in the future.”

Richard Hayman, Construction Manager BAM Nuttall